Decoration budget missing items low, intermediate, advanced articles

The problem of missed items in the renovation budget is a problem that many owners are worried about, especially where some owners do not have fitting-out experience. And now, a considerable portion of the decoration companies and decoration teams on the market rely exclusively on early-stage leakage items to report low total prices, add money later to make money, and turn it into a marketing tool. Produce basic decoration prices and “package” prices that are lower than the cost of the formal material process to attract customers. The situation of "Please enter the court" and "Hard tiger rides" are always performed.

>>>Related Links: The six decoration budgets are easy to overspend

Based on my own construction experience, I summarized some items that could easily be “finished” and classified them into low, intermediate, and advanced levels according to their “hidden” levels for reference.

Low-level articles:

1. Excluding projects involving kitchen and toilet downpipes. In fact, almost all houses have downpipes in the bathroom (two or more toilets, at least one toilet has downpipes, and some have downpipes), more than 70% of the kitchen There are also downspouts.

2. Does not contain any wall modifications, including wall-breaking, wall-climbing, shave-walling. In fact, now 90% of the houses have been modified to varying degrees during the renovation. More than 60% will shave half-walls into the wall at the entrance.

3. Does not contain any decorative modeling items - ceilings, TV walls, restaurant walls, sofa walls, entrance modeling, etc., but more than 90% of families will have more or less decorative items.

4. Excluding design fees, management fees, materials and garbage clearance freight, product protection fees, equipment wear fees, taxes, etc.

Intermediate articles:

1. No artificial cost for tile jointing;

2. Do not remove railings, doors and windows.

3. The hydropower reform adopts the “Autumn Afterwards Account” type to limit the length of hydropower pipelines in meters or in the advertising base price (package price), and this length is often not enough according to the formal process. And deliberately go around.

4. Does not include lighting, hardware, appliances, etc. The corner valve is particularly easy to do. In theory, it is available and can be used, but in fact for insurance and convenience, this has actually become a necessary project.

5. The area of ​​the house is calculated based on the building area.

Advanced articles:

1. The budget is only the paint cost of the ordinary painting process; the design plan requires special processes. Want to achieve the design effect? Add money.

2. The budget is reported to be low, but the price to enjoy is limited to the purchase of the specified main material. The specified main material has a relatively poor price/performance ratio, but if it is not bought, it cannot enjoy the budgeted price.

3. The wall treatment is only considered as a scraper, but it is not considered to be affixed with kraft paper, sanded, shoveled wall coverings, and to find yin and yang angles.

4. Make cabinets on the spot to do more than one area, and then coerce the owners to add money.

5. In this place where white cement is used, only the material for ordinary cement is made.

6. On-site production of wardrobes, wine coolers, and cabinets that are not topped, generally require gypsum board to close the gap between the top of the cabinet and the ceiling of the house; Some door frames are up and down, left and right, and the door opening is too high. There is no need to modify the door and frame of the door. This requires the use of wooden strips, plasterboards, etc. to modify the door frame; these are all details that the owner would normally not think of, but in fact must be done.

7. Does not include dual control switches. But usually at least the master bedroom should be double-controlled.

8. There are no tiling baseboards, and there are fewer people using brick baseboards now, but if you decide to make a brick baseboard, don't forget to check this one. Specially reminded the owners of the stratified floors that the brick skirting of the stairs has to be cut several times. The construction time for the relatively flat floor tile baseboard is greatly increased. Remember to carefully check the labor costs of this part and you should beat the flat floor tiles. If the line is high, if the budget is still based on the cost of labor on the ground, it will surely add money again.

9. The wire groove is only a hollow wall. In the actual decoration, there are usually more or less wire slots and boxes on certain load-bearing walls.

Decoration budget knowledge Children's room decoration study room decoration door price decoration design paint house decoration house plasterboard ceiling price decoration look decoration company okay master bedroom decoration wine cabinet cloth sofa cabinet door cabinet kitchen cabinet door bathroom ceiling material bathroom design bathroom ceiling bathroom tile bathroom door Bedroom Lighting Bedroom Wardrobe Tiles Walls Restaurant Ceilings Walls Tiles Tiles Price Kitchen Tiles Bedroom Lamps

Flood Light

1. Compact square form-factor outdoor high-power floodlight and Wall Washer for architectural and landscape lightings.
2. Cree or Lumileds LEDs in wide ranges of whites, tunable whites, mono colour,RGB, RGB+W and wide to narrow (3°) beam angles.
3. High brightness contrast level for smooth and consistent color change effect.
4. Extruded aluminum alloy body with high efficient heat dissipation fins, protective vent and clear glass diffuser.
5. Easy and flexible installation with adjustable 60° tit and rotatable mounting base.
6. AC110~220V or DC24V input voltage, Integrated AC power driver. DMX control with auto addressing function.
7. Rated IP 66


Flood Light,LED Flood Light,Architecture Flood Light,High Power Flood Light,Addressable Flood Light,Anti-clare LED Flood Lights,Narrow Beam Angle Flood Light

StrongLED Lighting Systems (Suzhou) Co., Ltd. , https://www.strongledcn.com

This entry was posted in on