Process:
Grassroots processing → elastic line → pre-shop → paving → grooving → cleaning
<<<Links: How to save money on ceramic tiles for home improvement
Construction Technology:
Before laying, molds shall be made to select bricks. Tiles with large deviations from the dimensions shall be selected and used at corners or not.
(1) Primary treatment: Dust and debris should be thoroughly cleaned, and there should be no defects such as emptying, cracking, and sanding.
(2) Stretching line: Before the construction, the elevation control line is popped around the wall, and a crosshair is popped out on the floor to control the floor tile separation size.
(3) Pre-paving: First of all, we should strictly select the color, texture, and surface smoothness of the floor tiles based on the drawings design requirements, and then pre-shop according to the drawings. The size, color and texture errors that may occur in the pre-paving are adjusted and exchanged until the best effect is achieved, and the paving is smoothly stacked and stored.
(4) Paving: laying a 1:3 dry hard cement mortar, mortar thickness of about 25mm. Before the tile is applied, the back of the tile shall be wetted. Place the tiles on the cement mortar as required and tap the tile finish with a rubber mallet until the flatness is reached.
(5) Stitching: Clean the joints 24 hours after the tiles have been laid, wipe the impurities in the gaps in the tiles before jointing, and use a special joint sealant.
(6) Cleaning: After the construction process (usually after 24 hours), clean the surface of the floor tile with cotton yarns and other objects.
Tile laying quality:
The surface of the tiles is clean, the pattern is clear, the color is the same, the joints are even, the periphery is straight, and the joints are smooth and smooth, and the plates are free of cracks, falling angles, and missing defects.
Ground tile laying:
1: The tiles should be immersed in water for half a day before use. Bricks should not bubble.
2: The kitchen and bathroom should have a water gradient, no water, water does not flow back. If the original waterproof layer is destroyed during construction, waterproof treatment shall be done. There is no leakage during the 12-hour test of accumulated water.
3: After the floor tiles are laid, bricks should be covered with cardboard, etc., and walk on the brick surface at least after 24 hours.
Laying of wall tiles:
1: When the grassroots is being dealt with, all kinds of dirt on the wall should be cleaned, and the water should be moistened one day in advance. If the grass-roots level is a new wall, when the cement mortar is 70% dry, bricks, bullets, and sticky-sandwich wall tiles should be used.
2: Tiles must be soaked in clean water for more than 2 hours before the paste, bricks do not bubble prevail, remove the dry stand-by.
3: When meeting the pipeline, lighting switch, bathroom equipment support, etc., you must use a whole set of bricks to cut anastomosis, prohibit the use of non-complete bricks together
Tiles Tiles Tiles Tiles Cement Switches Home Improvement Decoration Bathroom Design Toilets Waterproof Bathroom Tiles Bathroom Floor Tiles Bathroom Size Kitchen Tiles
Fireproof Aluminum Composite Panel
A2 grade fireproof Aluminum Composite Panel is a non-combustible, non-toxic and environmentally friendly product. The organic mineral filled core makes the A2 FR panel sheets one of the highest fire rated panel sheets currently in the industry and have been tested in accordance with various fire standards globally When the mineral filled core is subjected to heat, it does not emit any toxic-fumes or environmentally hazardous substances.Architects can specify the A2 FR Panel Sheets on projects where fire safety is of the utmost concern, such as public buildings, sporting arenas, tunnel walls, underground railway stations, etc., just to name a few.
Acp Sheet Door,Aluminium Composite Sign,Altobond Aluminium Panel,Acm Aluminum Composite Material
Shenyang Xiandai Jixiang Decorative Material Co., Ltd , https://www.modernbond-acp.com