First, before the construction of mason, it is necessary to make a complete acceptance of hydropower. Only after the acceptance of water and electricity has been completed, the mason can enter the field. In order to prevent damage to the line pipe during the construction process and eliminate the occurrence of hidden dangers, it is also necessary to protect the water and gas pipes from finished products.
Second, for the wall construction process, the decoration company uses an infrared level meter to make measurements to ensure that the wall is horizontal and vertical. The new masonry walls must be reinforced by wall bars every 50 centimeters. The verticality and horizontality error should not exceed 3mm. This also ensures the firmness and beauty of the wall. New walls more than 3 meters need to be made of strips to ensure the firmness of the walls.
Third, the light wall must be covered with anti-crack cloth, and then painted. The old and new wall joints should be excavated to remove the original wall stucco layer, plus a net painting, so that the old and new walls will be more firmly connected, if you do not eradicate the later wall joints will crack, causing unnecessary losses.
Fourth, the new wall requires a full seam, the top must use a small red brick ramp. The use of small red bricks is to prevent empty drums, to ensure that the pressure resistance, not easy to crack, if you cross to the top, the final caulking can not be fully filled, so that later the wall will crack.
Fifth, the new door must use galvanized angle iron, and the wall connection shall not be less than 10 cm, to ensure that the door will not be closed due to the door sinking poor (it is easy to deform with wood).
Sixth, the new wall to do a second paint, require vertical formation.
7. The requirements for the laying of wall tiles and floor tiles are horizontal and vertical, patchwork joints are neat, and empty-air drums are used. Finally, the inspection is carried out with a vertical 2m ruler, and the error is less than 2mm.
VIII. The joints between the wall tiles and the floor tiles must be tile-pressed floor tiles (1. State regulations 2. Secondary waterproofing). During the laying process, the tiles shall be tiled first, so that the empty drums are allowed. In order to allow the cement to fully solidify, the joints are caulked. Before you wait (3 days in summer and 5 days in winter), if you fill the joints directly, the cement does not dry, affecting the appearance. The height between brick and brick must be <0.5mm.
Tips: More practical decoration knowledge, real scene with the shoot, please pay attention to the palm of this site (micro signal: mall_jia).
Masonry works
It is made from high grade Low Carbon steel iron wire, heavy zinc coated wire, PVC coated wire though twisting and braiding by machine. as well as galfan coated units. Galfan is a high performance galvanising process using a zinc/aluminium/mischmetal alloy coating. This offers significantly greater protection than traditional zinc galvanizing. Where the product is exposed to water courses or a saline environment, we strongly recommends a polymer coated galvanized unit for improved design life.
Pvc Gabion,Pvc Coated Gabions,Gabions Mesh Galvanised Wire,Pvc Coated Gabion Mesh Box
Shenzhou City Hongda Hardware Products Co.,Ltd , https://www.hdpvcwire.com