Three screw pump maintenance: 1 overhaul period can be used according to equipment and maintenance ability to determine. The general minor repair period of about 3 months, overhaul period of 12 months. 2. Overhaul (1) minor repair Check and adjust anchor bolts to prevent loosening. a. Check the coupling concentricity. b. According to the leakage, overhaul the mechanical seal. c. Repair or replace worn parts during operation. (2) overhaul a pump, cleaning all parts, while cleaning the pump hydraulic balance hole, mechanical seal back to memory, to prevent blockage. b. Check the parts, measuring screw, pump sleeve, bushings, thrust pad wear procedures, if necessary, repair or replacement. c. Drilling holes and working surface of the screw must be repaired. d. Check the safety valve seat and valve seal, if necessary, with research. e. Inspect the bearings and replace if necessary. f. minor repair process found that the larger problems are handled according to the above situation.
Having two types of Electric Pile Driver need showing to you. One is GSH-30E, which voltage is 230V, Max.current is 9A, Max.power is 2000W, frequency is 50-60hz, no-load speed is 12/6 r/min, Max.toque is 3600 N.m and main body weight is 37.48kg and it can install 76x1800mm of Ground Screws and smaller. Another is GSH-50E, which voltage is 230V, Max.current is 18A, Max.power is 4000W, frequency is 50-60HZ, no load speed is 11/5 R/min, Max. Torque is 4800N.m and main body weight is 59.52kg and it can install 114x2500mm of Ground Screw Piles. Both electric Pile Driver are very high quality and exquisite.
Electric Pile Driver
Electric Pile Drivers, Ground Screw Machine, Electric Ground Screw Machine
Hebei Honde Industrial Trade Imp&Exp Co., Ltd. , http://www.groundscrewpile.com