What are the construction methods of real stone paint? Real stone paint construction summary

Real stone paint is the material we will use during the decoration process. Some non-professionals don't know about real stone paint, but it does provide some guarantee for our decoration. The sales volume in the market is also rising all the way. Today Xiaobian will spread the knowledge of some real stone paint construction for everyone. Friends who don’t understand in this area can quickly find out with Xiaobian!


真石漆施工


First, the real stone paint construction summary


1. Construction equipment requirements


(1) Air compressor: The power is more than 5, the air volume is sufficient, and at least three air pipes can be used to meet the construction of three or more people at the same time.


(2), the next pot spray gun: capacity 500ml, caliber 1.3mm or more, the capacity can not be too large, otherwise too heavy, inconvenient operation, small caliber construction speed is slow, may delay the construction period, not suitable for large-area construction.


(3), real stone paint spray gun: single gun, double gun, three guns, etc., according to different colors, choose single gun with single color, double gun, multi-color with double gun, three guns, in order to adapt to different construction techniques, spray more ideal effect.


(4), various caliber nozzles: 4mm, 5mm, 6mm, 8mm, etc., according to the requirements of the model to choose different nozzles, the smaller the diameter, the smoother and evener the spraying effect, the larger the diameter, the larger the flowering point, the stronger the convex and concave feeling.


2, real stone paint construction technical indicators


(1) Spraying base oil: use the lower pot spray gun, the pressure is 4-7Kg/cm 2 , the temperature during construction should not be lower than 10 ° C, spray twice, at intervals of 2 hours, thickness about 30 microns, dry at room temperature for 12 hours.


(2), spraying real stone paint: use real stone paint spray gun, air pressure is controlled at 4-7 kg / cm 2 , construction temperature is above 10 ° C, thickness is about 2-3 mm, if you need to apply two or three, then interval 2 hours, dry It can be polished after 24 hours.


(3), grinding: using 400--600 mesh sandpaper, gently smooth the surface of the real stone paint raised sand. Pay attention to the force should not be too strong, otherwise it will damage the paint film, causing the bottom to loose, in severe cases, the adhesion will be poor, and the real stone paint will fall off.


(4) Spraying oil: use the lower pot spray gun, the pressure is 4-7 kg/cm 2 , the construction is not lower than 10 ° C, spray twice, at intervals of 2 hours, the thickness is about 30 microns, and it takes 7 days to completely dry.


真石漆施工


3. Real stone paint construction method


(1) Grassroots treatment

The base layer treatment is a front-line, basic process for the coating of real stone paint, which plays a decisive role in the quality of the entire coating. Contaminants should be thoroughly removed before treatment. The qualified base layer should not be powdered, sanded, empty, delaminated, cracked and peeled. The base layer is cleaned and the water content should be < 10%, PH<9. After the new wall is made of cement mortar, it is required to dry thoroughly for more than 21 days. If the temperature is lower, the time is relatively extended. When the base layer is highly absorbent, it should be closed with a primer before the putty is applied, so as not to affect the adhesion and strength of the putty. If the base layer is too alkaline, it will affect the adhesion of the coating, and it will cause quality problems such as discoloration, shedding, fading, and yellowing of the coating. At that time, it is necessary to use a primer to prevent alkali and prevent alkali return.


(2) Scrape water resistant putty

Before flattening the water-resistant putty, the flatness of the wall surface should be measured. Generally, the wall surface can be scraped with 2 putty. To avoid excessive shrinkage of the putty, cracking and falling off should occur. The thickness of the first scraping should not be too thick, and the thickness should be 0.5~1mm. The interval between each channel is not less than 5 hours (at 25 ° C). When real stone paint is applied, it must be applied after the putty layer is dry. Generally, after the putty is scraped, it takes 24 hours (25 °C) to dry. Do not apply scraping too much to avoid curling, peeling off or extruding the rubber in the putty, and sealing the surface is not easy to dry. After each putty is scraped, it is polished and trimmed at a suitable level (25 ° C, drying for 4-6 hours). After the polishing is completed, the floating ash is removed.


(3) Roll-on seal primer

The sealing primer can increase the adhesion of the topcoat to the base layer, enhance the strength of the cement base layer, and have strong penetrating power. It can seal the capillary pores of the cement wall surface and prevent the alkali return. Therefore, it is necessary to ensure the quality of the real stone paint construction and use the closed primer. Very critical. After the putty layer is fully dried and solidified, the anti-alkali sealing primer is applied once, and the coating is required to be uniform, and there must be no leakage coating phenomenon. Since the sealing primer is transparent, care should be taken to prevent leakage coating during construction. In the event of a leak coating, the coating may be caused by efflorescence.


Through the introduction of the real stone paint construction in this article, I believe that everyone has a certain understanding of the real stone paint construction, there are other knowledge about the real stone paint, you can check it online, I hope this article can help the friends in need! For more information on decoration, please continue to pay attention to the decoration home network!


More related wonderful reading:

What are the roller coated real stone paints? Roll coating real stone paint construction method

What is the attention of the real stone paint on the exterior wall? Exterior wall real stone paint construction plan