Through the actual case, the installation and construction of the ball mill corundum lining board is not complicated. Generally, we usually divide it into three steps. Let me introduce you in detail.
Before the installation, the surface is cleaned to ensure that there is no dirt on the bonding surface, otherwise the bonding effect will be greatly affected. The wire brush or sandblasting method can be used to achieve the original color of the steel.
2. In the construction process, select the appropriate adhesive. Generally, there are two kinds of ceramic structural adhesive and 425 white cement. Apply the adhesive to the surface of the corundum lining and then press it firmly on the inner wall of the ball mill to bond the joint. The agent is applied tightly and remains staggered in the direction of flow of the material.
Third, after the end of the maintenance, if the temperature is lower, it is best to heat the barrel to achieve a better paste effect, usually eight hours will be solidified, you can use it with water maintenance. If you have any questions, please call us. Shi Zhiheng 13475595486
Http://news.chinawj.com.cn Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn
Pendulum Impact Test Machine,Pendulum Impact Tester,Izod Impact Testing Machine,Display Charpy Impact Testing Machine
Dongguan Best Instrument Technology Co., Ltd , https://www.best-tester.com