Process one: electrical circuit
In the home improvement process, the circuit transformation is indispensable, and the safety problems caused by the transformation are the most. A good circuit renovation program should not only pay attention to external effects but also take into account safety factors, and the convenience of future maintenance, and advance the 20-year plan of the line on the basis of economical guarantee. At the same time, in the actual construction, it is necessary to adjust the circuit capacity, deal with the interference between the strong and weak electricity, and the slotting and trending of the fractional route pipelines are all process nodes that need attention.
Process II: Up and down the water pipeline
Cold water, sloppy, hot and cold water is not hot, if the water goes thin, the drainage is not blocked... These things are already a lot of headaches, let alone a big event like “Shuishan Jinshanâ€. Putting an end to flooding is only the basic requirement that the project quality should meet. A more reasonable arrangement is to further consider how to reduce the resistance of water in the transportation process, how to configure the indoor hot water source in an energy-saving house, and how to combine water supply with heating. And so on.
Hidden Projects Hydroelectric Installation Del Floor Home Improvement Heating Paint Residential House Renovation Floor Tiles
Drainage Strip (named Plastic vertical drain) is like a cross parallel strips made of polyethylene and polypropylene as core board and wrapped by non-oven fabric as filter layer. Core board is to play a supportive role and drain the leaking water and air out of ground. Plastic vertical drain is inserted into soft soil foundation by drilling machine, under the upper part of the prepressure loading. The pore water in soft soil will be drained out through plastic vertical drain to the horizontal drainage system, and drain outward to accelerate the soft ground consolidation.
Features for Plastic vertical drainage strip:
1. Good Filtration performance, smooth drainage, drainage effect is guaranteed.
2. Good strength and ductility, can be suitable foundation deformation capacity without affecting drainage performance.
3. The section size of drain is small, so disturbance is small too to the foundation when in operation.
4. Fast construction and working time is short. Each drilling machine can finish over 15,000 meters, which greatly save cost and shorten the construction period.
5. Flexible construction and low requirement to construction environment, applicable to variety of soft soil foundation and super soft soil foundation reinforcement treatment.
Specification and Technical data:
Packing: Woven bag / PE bag packing or at customers' request.
Shipping: FOB Changsha, customized shipping-terms and appointed port accept.
Drainage Strip
Drainage Strip,Drainage Sheet Strip,Stainless Steel Strip,Geotextile Composite Drainage Strip
Shandong Tianhai New Materials Engineering Co., Ltd , http://www.chinatinhy.com