In the construction process of residential building decoration, the installation of hydropower hardware mainly includes: sanitary dip and installation of bathroom hardware, installation of electrical lamps and switch socket panels, installation of woodworking hardware items, etc.
1) Principles for installation of hydropower hardware
In principle, the installation of hydropower hardware is required to follow the ergonomics, to meet the customer's living habits and to facilitate the use of the customer. It should be simulated by the on-site simulation and with the consent of the customer. It must be firm and beautiful after installation, safe to use and flexible to open.
1 The installation of kitchen and bathroom hardware: It is best to locate it with the customer. Under normal circumstances, the height of the towel rack should be 1 500mm. Try to avoid it on the opposite side of the door and behind the door, and avoid it above the toilet. To choose a location with a relatively empty wall, it is advisable to use the top of the washstand and the toilet.
Installation of 2-roll carton: 200mm on the left or right side of the toilet, should be staggered from the towel rack, height 500-600mm. The inlaid face carton is placed at the height of 100 mm on the left side of the washstand.
3 The hair dryer is installed on both sides of the vanity table, at a height of 400-500 mm on the table top; the cup holder is installed at the upper left of the wash table at 100-150 mm.
4 When installing the mercury mirror above the washstand, the left and right sides are centered on the faucet, and the height is about 200mm from the bottom of the mercury mirror. After positioning as required, attach 1-2 mm thick foam double-sided tape to the mirror and apply the mirror nail to the joint of the mirror and the tile. Avoid the glue directly on the back of the mercury mirror. If the mirror does not use a mirror nail, you need to put a special tape on the back of the mercury mirror, and then stick it with glass glue.
5 Soap boxes and soap holders on the washstand are installed on the right side of the washstand 100^-150 mm.
The soap box and soap dish in the shower room are installed at 900-1000 mm in the shower room. The soap box and soap holder in the bathtub are installed at a height of 200-250 mm from the upper edge of the bathtub.
7 The shower faucet is installed at a distance of 800 mm from the ground and installed in the middle of the shower zone. The left hot right cold water is required. Avoid the water outlet point on the tile waist line. The two outlet holes of the shower faucet should be on the same horizontal line, and the stainless steel cover plate is in good agreement with the wall without gaps.
The 8-seat outlet valve is installed 200 mm to the right of the toilet drain, 200-250 mm from the ground. The delay flush valve is preferably 800 mm from the ground. It is strictly prohibited to be installed on the tile waist line.
9 Toilet brush should be installed on the wall near the toilet or on both sides of the toilet, 150 mm off the ground.
The 10 coat hooks are mounted on the back of the bathroom door, 1 800 mm from the ground. The shower curtain rod is installed in the shower section, 1 800mm from the ground; the angle valve of the washstand and the column basin is installed at 400-500 mm from the ground.
2) Installation precautions
1 When installing, determine the location of water pipes and wires according to the water circuit and circuit diagram. Be sure to avoid water pipes and wires to prevent breaking the water pipes. Cut the wires.
2 When installing on the surface of the tile, first use a glass drill to pierce the tile, or use a steel nail or a hammer to gently tap the tile and then punch it with a hammer.
It is strictly forbidden to break the tiles and replace the tiles once they are broken. Pre-embed the expansion bolts and secure the hardware.
3 When installing, the tool can't directly touch the hardware. After wrapping it with a clean soft cloth, it can be tightened. The hardware can't be scratched.
4 All kinds of faucets or mixers must be installed with stainless steel cover bowls.
5 Before installing the shower room and bathtub, pay attention to whether to reserve power and reserve other electrical backup power (such as hair dryer, hand dryer, etc.).
6 When installing the toilet, do not fill the cement underneath to prevent the toilet from bursting; apply the matching sealant. Then apply the glass glue on the outside.
7 Electric water heaters and other related equipment should be installed on the load-bearing wall.
3) Installation of woodworking hardware
The installation of woodworking hardware is generally installed by woodworkers. In this case, there are few woodworking hardware involved. Before the installation of this hardware, the problem of paint should be considered, and the problem of connection with the painter should be considered.
1 The installation time of the hardware can not be arranged too early. Otherwise, the painter should consider the protection of the hardware too much during the construction.
2 When installing hardware, be careful not to damage the construction that the painter has already completed.
Therefore, the normal hardware installation and construction is often arranged such that the hardware required for drilling is basically completed before the painter is constructed, or before the main process is completed, and the others are installed after the painter finishes.
4) Installation of electrical lamps and switch socket panels
The construction of this link should be arranged after the completion of the work on the wall latex paint or wallpaper. Under normal circumstances, manufacturers with large volume or expensive price, manufacturers provide free installation, small volume or cheap, generally do not provide free installation services, by electricians to complete.
5) Sanitary ware and bathroom hardware installation
The sanitary ware installation time should be completed when all construction projects are completed and most of the workers have been evacuated. It is best not to install sanitary ware before the project begins to accept and most of the construction personnel have not evacuated the site to avoid unnecessary troubles for site management. Therefore, the installation of sanitary cookware and bathroom hardware should be at the final stage in the arrangement of time.
The installation of this part is generally installed by the manufacturer of the selected sanitary ware. It is necessary to reserve the delivery and installation time in advance. It can be understood by the building decoration designer. The theoretical installation content is omitted here.
Concerned about surprises
Label: Hydropower Hardware
Previous: Hardware accessories for cabinets to buy common sense is very important Next: Hardware door locks also have shelf life, door and window accessories are also very important
Stainless Steel 6.00ml/rev Gear Pump
Stainless Steel Anticorrosion Magnetic Gear Pump,Stainless Steel Magnetically Coupled Dosing Pump,Stainless Steel Magnetic Gear Displacement Pump
Suzhou Macxi Fluid Technology Co.,Ltd. , https://www.macxipump.com