1. The waterway reconstruction should follow the principle of “walking the top without walking, walking without verticalâ€. The top must be fixed with metal pipe clamps, and the spacing is not more than 60 cm.
2, the shower outlet should be left hot right cold, hot and cold water spacing is 15 cm, to ensure that the water outlet is on the same level, and to verify the specific size of the brick, to avoid the water outlet to stay on the waist line.
3. The water circuit line tube cannot be in the same slot.
4. It is not allowed to open horizontal grooves on the wall.
5. After the water conversion, the water pipe water test must be carried out to ensure that each water is unobstructed.
6. After the water reform, the pressure test must be carried out, and the pressure is about 8 kg for 30 minutes.
7, the mobile floor drain water PVC material should use a 50-caliber water pipe.
8. The wall sealing groove must be kept flat, and the ground joint can not be 2 cm above the ground for easy tiling.
9. To increase or move the floor drain, you need to raise the ground. If you want to use a deep water seal to drain the floor, the ground must be raised at least 10 cm. You can use the partial or full elevation method.
10, it is best not to add a washing machine floor drain on the floor drain, otherwise it is easy to return to the water. This problem is not involved if the basin is displaced or increased.
11, flat-level changes to the toilet also need to raise the ground. The displacement of the toilet is generally a shifter, but generally it can only be moved by 10 cm, and it is easy to cause blockage.
12. Do not slot in the floor heating or heating pipe area.
Second, the circuit transformation:
1, the circuit transformation should be carried out point-to-point near the lead, to ensure that the circuit is all live, easy to repair in the future.
2. It is not allowed to open horizontal grooves on the wall.
3, the line tube must be fixed with a metal tube card, the spacing can not be greater than 60 cm. Use cement to fix the place where the floor can't be punched.
4. You cannot put the telephone line and TV line in the same pipeline.
5. The new connection between the cassette and the cable box should be connected with a lock.
6. After straight-through between the line pipe and the line pipe, apply PVC glue on the connection between the two sides.
7, strong electricity must be tested for power. The socket can be tested with a power tool and the lamp path can be tested with a light bulb.
8, weak current must use a multimeter for continuity testing.
9, the wall sealing groove is flat, to ensure that the line pipe into the wall can be smoothly tiling or laying the floor in the future.
10. The over-line box can't be blocked, and the whiteboard should be covered later.
Regarding the relevant knowledge about the hydropower transformation , the decoration house decoration network Xiaobian will introduce you here, I hope that you can pay more attention to hydropower transformation after watching! For more related knowledge, please continue to pay attention to our decoration encyclopedia section!
More related reading:
What issues should be paid attention to in hydropower transformation? Hydropower transformation considerations
What are the hydropower transformation materials? Hydropower transformation materials list
Hydropower transformation details hydropower transformation considerations
Plastic Masterbatch Deodorant
Plastic Masterbatch Deodorant,Plastic Particle Deodorant,Plastic Producing Deodorant,Polymer Masterbatch Deodorant Agent
Ningbo Jiahe New Materials Technology Co.,ltd , https://www.cnjhchem.com