The embryo house is also called the "decorated house." Most of the houses in this house do not have doors and windows, and the walls and the ground have only been processed at the grass-roots level without surface treatment. And all the decorative surfaces outside the house, including balconies and rain covers, should be renovated according to the design requirements. Therefore, such a house basically has only one frame of the house, and all the finished products are not, so it needs to be added one by one during the renovation process. Below, Xiao Bian gave everyone a copy of the budget for the furry room decoration project.
First, the hair embryo room decoration budget table
The decoration budget list should take into account the price of each material, labor money, freight costs, and taxes. And so on, but these are a lot of points, and there's a difference in the consumption of each place, so these costs are not the same. And if the materials are divided into brands, the price of each brand is not the same. There are also sub-models in a brand, and the quality of each model is not the same. So the design industry is more. It takes a lot of manpower and time. Quite awkward, but expensive to save money.
There are many budgetary design projects for decoration, and they generally include: paving bricks, standing pipes, waterproofing, wall painting, wall base treatment, ceiling tiles, partitions, waterway reconstruction, tiling, and the need to buy a security door. The threshold stone, the living room waveguide line, the living room baseboard, the living room wall main material, the entrance, the shoe cabinet, the TV cabinet, the TV background wall, the sofa background wall, and the living room floor materials. These are basic and approximate. Such as paving brick which also consider how much a square paving, how much a brick. How much is the labor cost? People with less general logic thinking do not have such a list.
1. Home decoration budget list of light industry accessories
The budget of the basic decoration is generally given by the decoration company. According to the house area of ​​80m2, the two-bedroom house price is between 120,000 and 10,000, and the large decoration company's offer will be higher.
2. Home renovation budget list of hydropower reform
The cost is about 3,000 yuan. There is more moisture in the water and electricity, and there is no limit on the price. It depends on how the owner plans the water circuit.
3, home decoration budget list of the main material price
Main materials include ceramic tile (floor), paint, wooden door (alloy door), cabinet (smoking hood), bathroom accessories (bathroom), suspended ceiling, etc., of which the budget for ceramic tiles is conservatively stated at around 8000 (good brand has no ceiling). The solid color of paint is also more than 2,000, wooden doors and alloy doors are estimated to be at least four, at least 6,000, cabinets conservative 15,000, sanitary ware 4000, ceiling 2000, there are lamps and lanterns 2000 yuan, curtains 2000 yuan, northern heating radiators 4,000 yuan, as well as the cost of gargles, hardware, etc., are not listed one by one.
4, home decoration budget list of furniture
Furniture costs are actually very high, especially solid wood furniture, if you choose the plate furniture will save money, which generally have 2 beds, 1-2 wardrobes, TV cabinets, sofas, table chairs, shoe cabinets, sideboards, etc. Wait. The conservative estimate of furniture prices has also been around 30,000, depending on the actual purchase.
5, household decoration budget list of home appliances
Air conditioners, washing machines, electric water heaters, refrigerators, televisions, computers, water dispensers, etc., how much the budget, brand prices, etc., are not very good estimates, can only be said to see the owner's personal choice and economic strength.
Second, the embryonic room decoration process
Process 1: Measuring Area
Before the renovation, the area involved in the renovation must be clearly defined, especially the area of ​​the tiles, the area of ​​the wall tiles, the area of ​​the wall paint and the area of ​​the wallpaper, and the floor area; secondly, the size of the wall, especially the size of the furniture, must be clarified. All should be considered at this time so that the overall space can be planned rationally. In addition, due to the renovation of the embryonic house, there are no other items in the overall space, so it is necessary to pay attention to the area of ​​the doors and windows in the room so as to more reasonably plan the overall area.
Process 2: The main highlights Chaigai sense of space
Some owners will demolish the main wall before renovation. Mainly include the demolition of walls, walls, spade shovel, change steel windows and so on. After the demolition, the garbage needs to be cleared out in time to ensure that the interior is clean and tidy and convenient for future construction. In addition, the subjects of demolition and reform are all items that need to be planned and designed by the designers to be deconstructed. If the subject wall is demolished and changed without authorization, it will affect the normal life in the future. Such demolition and modification will reduce the ability of the whole house to resist shock. , will leave security risks.
Process 3: Hydroelectric Reform
Before carrying out the hydropower reform, it is necessary to make a preliminary plan for the approximate location and size of cabinets, range hoods, electrical appliances, furniture, etc., because in the process of decorating the water and electricity pipelines, we can reasonably plan the number of outlets. . As the hydropower projects in the kitchen and bathroom are more important, the exact location of the switches, lamps, basins, bathtubs, washing machines, etc. must also be determined in advance during the bathroom renovation process. Before the hydropower reform, the first cabinet size measurement can be made so that the cabinet company can design a suitable cabinet according to the size.
Process 4: Basic decoration
In the decoration process of the embryonic house, basic decoration is the most important step. Because there are many steps in the decoration, and the time of entry is different, it is necessary to plan the order of the decoration workers. In the general renovation, which dirty should be followed in the order of which advanced field is to be constructed. Therefore, the basic decoration project can first allow the mason master to enter the field, the construction decoration includes the ground, the wall tile paving, followed by the woodworking approach, and finally the painter approach.
Process 5: Installing Doors and Windows
After the basic renovation work is completed, the doors and windows in the room need to be installed. In this process, the cabinets are required to be installed together. Installation of cabinets is a cooperative project, so range hoods, stoves and sinks should be reserved in advance. It is best to install kitchen cabinets and other products on the same day. Due to the complicated installation steps of the door, hinges, door locks, door stoppers, door frames, and so on, many tools are used, such as installing the floor first, and the bumping is difficult to avoid.
Process 6: Acceptance
The final step in the decoration process of the embryonic house is the acceptance project. There are many projects included in the inspection and acceptance work. Therefore, they must not be treated sloppy during the inspection and acceptance process, because this is the main manifestation of whether the quality of the whole house decoration has passed or not. If there is any irregularity at this stage, the owner needs to promptly put it forward so that the decoration company can make timely corrections.
For owners who do not understand the decoration, first of all should pay attention to some of the information related to the decoration process of the embryonic house , and it will also make you more comfortable in the decoration. For more decoration knowledge, please continue to pay attention to this site information.
Decoration budget family decoration budget table decoration budget list embryo embryo room decoration process