1, inspection of the house is a hard and complex project, must be in place before the start of preparations, this eye can be handy. The purchase contract must be available, and there are many attachments on the contract that are important for the acceptance of the furnishing room, such as the community map and the detailed rules.
2. The drawing of the room type with dimensions should be prepared before acceptance of the house, not only the floor plan of the house, but also the circuit and waterway drawings.
3, before the acceptance of the house to get a good key, the key number is more, there are floor keys, door keys, water meters, meter keys, be careful not to miss.
4. The decoration material confirmation sheet is also indispensable for acceptance. The above records the brand, style and model of the material, and it is necessary to check the acceptance of the fully furnished room.
5, acceptance structure. It was found that the structure of the fully-decorated room was inconsistent with the contract and must be submitted to the real estate developer prior to arrival. If the resistance was encountered, it could also be reported to the relevant government departments. If only the non-structural problems were found, the house could be hand-written when it was handed over to require real estate records. The company has written a commitment to perform maintenance within a certain time limit. The first step is to inspect the whole house after renovation, check the area, check the orientation of the location, measure the public area, and check whether some outdoor facilities are intact.
6, inspection room should pay attention to whether the materials used are consistent with the promised on the contract, whether it is a well-known brand, whether the model style corresponds to, and so on, there are errors should be promptly negotiated.
7, a small high-rise decoration sometimes appears such a problem, the height and the developer's commitment is inconsistent, the height of the high-rise in the decoration before the tension of the high-level, after the decoration is more likely to become depressed.
8. Whether or not a balcony can be closed is a common concern for owners who need to pay attention after the house is requisitioned. Owners who purchase the house must also consider that if the balcony is to be closed in the future, some layouts may need to be changed.
9, when the acceptance of the bathroom, you can put a half-cylinder in the bathtub to soak overnight, the next day we will know whether the bathtub will seep water and whether the water is smooth, with the owners upstairs to negotiate, with the same method, we know the ceiling will seepage, but also pay attention Whether there is blistering and paint peeling off the outer wall of the bathroom; toilet or wash table to see if polished and smooth. Check the upper and lower water pipes in the bathroom to see if the drainage pipe drainage is smooth.
10. Whether the bathroom exhaust hole has been left well is a link that should not be neglected in the acceptance. You can uncover the ceiling to check if the pipes are all in place.
Notice of Housekeeping Inspection House Decoration Precautions House Renovation House Window Housing Paint Flooring Tile Kitchen Cabinet Door Cabinet Door Cabinet Door Kitchen Wall Tiles Bathroom Door Toilet Ceiling Material Bathroom Wall Tile Bathroom Size Bathroom Floor Tile Bathroom Ceiling Overall Bathroom Toilet Door Size Bathroom Leaking Water
Dry Floor Fountain,Musical Fountain,Outdoor Water Features,Music Dancing Fountain
Guangzhou Dewy water fountain Technology Co., LTD , https://www.dewyfountain.com