1. The use of a tool scaffold must be designed and compiled with a construction plan and approved by the person in charge of the technical department.
2. Enterprises engaged in the construction of adhering lifting scaffolds must obtain the qualification of “adhesion lifting scaffold professional contractingâ€.
3. Adhesion lifting scaffolds must comply with the Interim Provisions on the Administration of Attached Scaffolds for Construction (No. 230 [2000]). Attached lifting scaffolding (including pylon, hanging basket) Construction work surface must be laid solidly and tightly with a scaffolding plate. An 18 cm high footrest plate is to be provided. The frame body is closed along the inner side of the outer row with a dense mesh safety net. Two 1.2-meter-high body-guard rails shall be added on the inside, and a body-guard railing shall be set up on the outside of the work surface. The safety net should be woven around the bottom of the scaffold board.
4, outside the basket and both sides of the application of dense mesh safety net tightly sealed. In the course of using the lifting scaffolds, hangers, hanging baskets, etc., the first level of horizontal safety net must be set in accordance with the operating standards of the high places, and the hanging baskets should be firmly attached to the buildings.
5. An independent safety rope must be used when the basket is lifted and lowered. The rope diameter is not less than 12.5 mm. The operator wears a safety belt.
6. The length of the cantilevered beam must be perpendicular to the steel wire rope of the hanging basket. Effective measures must be taken to ensure that the strength, rigidity, and stability of the cantilever beam can meet the construction safety requirements. The rope has measures to prevent it from being separated from the cantilever beam. After the riveting of the basket, the reserved rebar ring should have sufficient strength. After the riveting, the strength of the building must meet the construction requirements.
7. The hanging basket length must not exceed 6 meters.
8. The hanging point of the external hanger adopts the bolt through the wall. The bolt through the wall must have enough strength to meet the construction needs. The bolts are used to padded the plate and fastened with double nuts. The structural strength of the building at the suspension point must meet the construction requirements.
9. Take measures to prevent shear damage to the wire rope at the contact point between the wire rope and the angular object.
10. The elevator well bearing platform and material turnover platform must develop a special program and perform acceptance procedures.
11. The scaffold board on the material turnover platform shall be tightly secured with a protective fence not less than 1.5m around the platform. The inner side of the fence shall be sealed with a dense mesh safety net, and the lower mouth shall be set with a 18-cm footrest plate. For the erection of articles, the platform shall be provided with signage in obvious places, specifying the use requirements and limiting the load.
China Labor Insurance Network
Product Features
1. Good physical and mechanic performance.
2. High tearing resistance, strong deformation adptability.
3. Corrosion resistance, aging resistance.
4. Good adaptability to high and low temperature, non-toxicity, long service life.
5. Good waterproof, drainage, anti-seepage and damp proof effects.
6. Complete width and thickness specifications, low cost and easy installation.
Product Application
Construction Method
2. Tow adjacent longitudinal joints should not be in a horizontal line, should bestaggered more than 1m each other.
3. Longitudinal joints should be more than 1.50m away from the dam foot and bending foot, and should be located on the plane.
4. When the slope is laid, the direction of spreading film should be basically parallel to the slope line.
5. The construction, first of all to use small diameter sand or clay levelingbase, and then laid the geomembrane. The geomembrane should not be stretched too tight, and the part of the soil bured at both ends is corrugated. A transitional layer of about 10cm is laid on the geomembrane with sand or clay.
Why Choose Us?
Company Information
Customer Feedback
Packaging & Shipping
FAQ
Q : Are you a factory or trading company?
A : We are a professional manufacturer that specialized in geomembrane, geotextile, Composite Geomembrane etc with ISO9001 certificate more than 15 years.
Q : Where is your factory located? How can I visit there?
A : Our facoty is located is No.10 Yuanshan Road High-tech Development Zone, Laiwu District, Jinan City China. You can take the plan to Jinan Yaoqiang International Airport, then we can pick you up.
Q : Could you send the sample before order confirmation?
A : Yes, we'd love to send a free sample to you for an evaluation if you need.
Q : How about the delivery time?
A : General within 3-7 days after received the deposit.
Q : Can you produce the product according to customers' requirements?
A : Sure, we are professional manufacturer, OEM and ODM are both welcome.
Geotextile Fabric,Hdpe Geomembranes,Pp Pet Geotextile,Geosynthetic Clay Liner
Shandong Jinruixiang Geotextile Material Co., Ltd , https://www.jrxgeosynthetics.com